FleetPulse PMI Checklist
Discover essential steps for conducting a thorough preventive maintenance inspection (PMI) to enhance fleet safety and efficiency.
Table of Contents
Purpose: To ensure FleetPulse products are properly installed and functioning as designed during customer- defined trailer PMI services.
NOTE: Refer to the product-associated PMI guide to confirm points of inspection.
1. Customer, Vehicle & Product Information
- Company Name
- VIN, Unit ID
- Year, Make & Model
- Product/Telematics Type
- Inspection Date
- Inspection Address
- Inspector Name
- Repair Order No.
2. Untethered Data Validation
- Using the FleetPulse mobile app or desktop website, confirm the asset VIN matches the installed FleetPulse telematics device type and serial number.
- Review and validate the accuracy of untethered sensor data on the FleetPulse platform. *Support
3. Visual Inspection
3.1 Device Mounting
- Confirm the FleetPulse telematics device is securely mounted to the trailer in the designated location and position. *Support
- Verify the device assembly is free from physical damage (e.g., cracks, dents, or missing components).
3.2 Wiring and Connections
- Check that all wiring from the FleetPulse telematics device is securely mounted, connections are in locked positions, and wiring is routed properly to avoid wear and tear.
- Repair any connectors that are loose, unplugged, or show signs of corrosion.
3.3 Sensors and Power
- Inspect and test all sensors (e.g., tether, battery, door) for functionality, secure mounting, and physical damage.
- Confirm the FleetPulse telematics device is receiving power and battery charging is functional.
4. Tethered Data Validation
- Review and validate the accuracy of tethered data updates on the FleetPulse platform.
- Confirm temperature or other environmental sensors (if installed) are accurate.
5. PMI Record Sheet
Complete the inspection form and obtain sign-off from supervisor.
| PMI Checklist | Pass | Fail | Initial |
|---|---|---|---|
| Untethered Data Validation | |||
| Visual Inspection | |||
| Tethered Data Validation |
Inspector Signature: ______________________________
Supervisor Signature: ______________________________
Follow-Up Items
| Item | Condition | Date | Initial |
|---|---|---|---|